Zoomlion Engineering Vehicles Serve the Bridge Construction in Serbia
Date:2015-01-12 Source:www.chinaspv.com
www.chinaspv.com: On 18th Dec.2014, the ribbon-cutting ceremony of Bridge Belgrade of Serbia was held, representing the formal completion of the construction of the first bridge made by China in Europe. During the project construction, Zoomlion concrete machinery, crawler cranes, auto cranes, tower cranes and rotary drilling rigs contributed a lot, impressed for good performance.
As known, this project started in 2011, the after-sales service team offers generous help, offering the complete service solutions in terms of hard constructions and tight schedule, not only dispatching professional service engineers and technicians resident in the construction site for technology training, but also making regular maintenance of devices to ensure the normal operation in the successive highly intensified working environment. Meanwhile, Zoomlion cooperates with the local contributing repair station with the guarantee of fast response in service, component supplying and service.
Views:1928