Sinoboom GKH22 Aerial Work Platform Rolls off the Production Line
Date:2014-11-18 Source:www.chinaspv.com
www.chinaspv.com: On 12 Nov.2014, the first Sinoboom GKH22 hybrid mode boom aerial work platform slowly drove out the workshop in cheers, successfully rolling off the production line after several tests, which will be shown at Bauma China 2014, to be launching the market in the middle of 2015 as the plan.
Aerial work platforms independently developed are competitive in some points such as extra large working radius, big bearing capability, strong mobility, high operation efficiency, available to work crossing some obstacles, A-shape landing leg design, synchronous vertically scale, short time for level finding, power-take systems shifted by gas-electricity, easy operation and flexibility.
Sinoboom aerial work platform GKH22 offer safe, effective and highly reliable operation mode for customers, about to broadly apply in power maintenance, project construction, urban landscape, airport ports, screen wall projects and outdoor advertising.
Views:1422